Mamá & Embarazo

Rådgivare Joaquin Leal//
Section of Jiulongjiang Grand Bridge rotates to designated position

 

Aerial photo taken on Jan. 21, 2021 shows a section of the Jiulongjiang Grand Bridge, one part of the Fuzhou-Xiamen Railway which is under construction, completing rotation to its designated position in southeast China’s Fujian Province. This section of the Jiulongjiang Grand Bridge, with a length of 160 meters and a weight of over 14,000 tons, successfully rotated to the designated position on Thursday. (Xinhua/Lin Shanchuan)

   1 2 3 4 5 Next       1 2 3 4 5 Next   

Más de tips Femeninos